It’s reported that Hong Kong-Zhuhai-Macao Bridge ________ in 2017.
A. builds B. is built C. will be built D. will build
九年级英语单选题中等难度题
一It’s reported that the Hong Kong-Zhuhai-Macao Bridge ______in October , 2018.
一Yes, that' really good.
A.completed B.was completed C.has completed
九年级英语单选题困难题查看答案及解析
It’s reported that Hong Kong-Zhuhai-Macao Bridge ________ in 2017.
A. builds B. is built C. will be built D. will build
九年级英语单选题中等难度题查看答案及解析
(广东省2017年初中毕业生学业考试模拟)It’s reported that Hong Kong-Zhuhai-Macao Bridge ______________ in 2017.
A. builds B. is built C. will be built D. will build
九年级英语单选题中等难度题查看答案及解析
— It is said that Hong Kong-Zhuhai-Macao Bridge was put into use in July, 2018.
—________! It provides a quick way for people to travel around.
A.No problem B.Never mind
C.It sounds like a good idea D.What good news
九年级英语单选题中等难度题查看答案及解析
Hong Kong-Zhuhai-Macao Bridge to form three-hour travel circle. The 55-kilometer bridge in the Lingdingyang waters of the Pearl River Estuary, which was opened in late October 2018, is the world's longest sea bridge. The project follows the logic that China has been using for years to guide economic development - if you want to get rich, first build a road.
At 20 times the length of California's Golden Gate Bridge, the six-lane crossing will link a regional economic zone of 70 million people, with a combined annual GDP of $1.51 trillion--almost twice that of the San Francisco Bay Area, and larger than the national economies of Australia, Spain or Mexico.
The links are part of a plan to create an integrated(综合的) region that officials have dubbed(被称为) the “Greater Bay Area”. The bridge will put Hong Kong, Macao and Zhuhai within an hour of each other. The main bridge, together with crossing facilities and link roads, is designed to meet growing demands for passenger and freight transport between the three cities. A “three-hour tour and golden circle” will be formed thanks to the massive(巨大的) bridge, road networks and rail links to other cities, making more travel itineraries(旅游活动日程)available.
1.Hong Kong-Zhuhai-Macao Bridge was opened _____________.
A. In early October 2018. B. In late October 2018.
C. In early November 2018. D. In late November 2018.
2.It is designed to meet growing demands for _____________.
A. passenger transport. B. freight transport.
C. passenger and freight transport. D. goods transport.
3.Which of the following is TRUE according to the passage?
A. The seven-lane crossing will link a reginal economic zone of 70 million people.
B. The annual GDP of the economies of Australia, Spain or Mexico are larger than that of the regional economic zone in China.
C. The bridge will put Hong Kong, Macao and Zhuhai within an hour of each other.
D. A “three-hour tour and golden circle” will be formed just thanks to the massive bridge, road networks .
九年级英语阅读单选中等难度题查看答案及解析
Hong Kong-Zhuhai-Macao Bridge, the longest sea-crossing bridge, _________ in 2018.
A. will complete B. completed
C. will be completed D. was completed
九年级英语单选题中等难度题查看答案及解析
Hong Kong-Zhuhai-Macao Bridge is much __________ than any other sea bridge in the world.
A.long B.longer C.longest D.the longest
九年级英语单选题中等难度题查看答案及解析
— has Hong Kong-Zhuhai-Macao Bridge been in service?
— Since 24th October, 2018.
A.How often B.How far
C.How soon D.How long
九年级英语单选题中等难度题查看答案及解析
The Hong Kong-Zhuhai-Macao Bridge ________ is a masterpiece(杰作)in modem engineering has won high praise from the world.
A.what B.why C.where D.which
九年级英语单选题中等难度题查看答案及解析
The Hong Kong—Zhuhai—Macao Bridge in 2018. We are proud of it.
A.is completed B.is completing C.was completed D.completes
九年级英语单选题困难题查看答案及解析