A new eight-kilometre road is under construction that links the port area with the motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometre road tunnels are being built below the central area of the city, one for traffic to the north and the other for traffic to the south .The two tunnels are about 20 metres below the surface and are 12 metres wide, providing for two lanes of traffic in each direction.
In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electronic signs at frequent intervals (间隔). They show traffic conditions ahead, and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and , on the inside of the tunnel , a concrete lining (混凝土衬砌).
Each tunnel is roughly round and the lower part of the tunnel is somewhat flat .The surface of the road lies on the base, which is made of concrete and steel. The drainage system (排水系统), just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel, and at the level of the road surface. Other systems in the tunnel will include emergency phones .
1.Each of the tunnels under construction is ________.
A.eight kilometers long and twelve metres wide
B.eight kilometers long and six metres wide
C.four kilometers long and twelve metres wide
D.four kilometers long and six metres wide
2.Which part of the tunnel in the diagram is used to pipe out extra water?
A. 1 B. 3 C. 5 D 6
3.Driving in the tunnel , one can know the traffic conditions ahead through ________.
A.the lights B.the electronic signs
C.the trucks and cars D.the emergency phones
4.The passage is mainly about ________.
A.the construction of a road
B.the design of a road
C.the construction of two tunnels
D.the design of two tunnels
高二英语阅读理解中等难度题
A new eight-kilometre road is under construction that links the port area with the motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometre road tunnels are being built below the central area of the city, one for traffic to the north and the other for traffic to the south .The two tunnels are about 20 metres below the surface and are 12 metres wide, providing for two lanes of traffic in each direction.
In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electronic signs at frequent intervals (间隔). They show traffic conditions ahead, and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and , on the inside of the tunnel , a concrete lining (混凝土衬砌).
Each tunnel is roughly round and the lower part of the tunnel is somewhat flat .The surface of the road lies on the base, which is made of concrete and steel. The drainage system (排水系统), just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel, and at the level of the road surface. Other systems in the tunnel will include emergency phones .
1.Each of the tunnels under construction is ________.
A.eight kilometers long and twelve metres wide
B.eight kilometers long and six metres wide
C.four kilometers long and twelve metres wide
D.four kilometers long and six metres wide
2.Which part of the tunnel in the diagram is used to pipe out extra water?
A. 1 B. 3 C. 5 D 6
3.Driving in the tunnel , one can know the traffic conditions ahead through ________.
A.the lights B.the electronic signs
C.the trucks and cars D.the emergency phones
4.The passage is mainly about ________.
A.the construction of a road
B.the design of a road
C.the construction of two tunnels
D.the design of two tunnels
高二英语阅读理解中等难度题查看答案及解析
The new stadium under construction for the next Asian Games the present one is due to be completed in two months.
A. measured three times as big as B. measuring three times as big as
C. measured as big as three times D. measuring as three times big as
高二英语单项填空困难题查看答案及解析
Passage 1
The Information Highway is the road that links computer users to a large number of on-line services: the Web, e-mail, and software, to mention just a few. Not long ago, the information Highway was a new road, with not many users. Now, everyone seems to want to take a drive, with over 30 million families connected worldwide. Not surprisingly, this well-traveled highway is starting to look like a well-traveled highway. Traffic jams can cause many serious problems, forcing the system to close down for repair. Naturally, accidents will happen on such a crowded road, and usually victims are some files, gone forever. Then, of course, there’s Mr. Cool, with his new broad-band connection, who speeds down the highway faster than most of us can go. But don’t trick yourself; he pays for that speeding.
Passage 2
Want to know more about global warming and how you can help prevent it? Doctor Herman Friedman, who is considered a leading expert on the subject, will speak at Grayson Hall next Friday. Friedman studied environmental science at three well-known universities around the world before becoming a professor in the subject. He has also traveled around the world observing environmental concerns. The gradual bleaching (变白) of the Grate Barrier Reef, which came into the public eye in 2002, is his latest interest. Signed copies of his colorful book, which was published just last month, will be on sale after his talk.
1.The Information Highway _________.
A. appeals to a large number of users
B. is crowded with car drivers
C. offers just a few on-line services
D. is free from traffic accidents
2. How does Mr. Cool manage to travel the Information Highway so fast?
A. By storing fewer files.
B. By repairing the system.
C. By buying a better computer.
D. By using a broad-band connection.
3. What can be learned from Passage 2?
A. There will be a book show at Grayson Hall.
B. Friedman is now studying the Great Barrier Reef.
C. There will be a talk on global warming this week.
D. Friedman is a leading expert on computer science.
4. Passage 2 is most probably .
A. a poster about a lecture
B. an ad for a new book
C. a note to a doctor in a university
D. an introduction to a professor
高二英语阅读理解中等难度题查看答案及解析
— What is that building ______ construction ?
— It looks like a hospital..
A. under B. on C. in D. through
高二英语单项填空中等难度题查看答案及解析
—What an exciting project!
—It is believed that the construction of the new highway will the growth of the suburbs.
A. be superior to B. contribute to
C. pay attention to D. belong to
高二英语单项填空中等难度题查看答案及解析
The transportation has improved a lot in our city, with two new roads _______ last year.
A. constructing B. to construct C. constructed D. construct
高二英语单项填空中等难度题查看答案及解析
There is a new problem________in the popularity of private cars that road conditions need improving.
A.involved B.to involve
C.involving D.being involved
高二英语单项填空中等难度题查看答案及解析
There is a new problem____the popularity of private cars that road conditions need ____.
A.involve at; to be improve B.involved in; to be improved
C.involving in; improving D.involving at; improving
高二英语单项填空中等难度题查看答案及解析
The Eurotunnel is a tunnel(隧道) which crosses the Channel under the sea, linking France and the UK. It is about 50.5 km long and 38km lies under the seabed. There are trains which carry passengers and cars, and others which carry carriages or other heavier vehicles(车辆), as well as goods.
The construction of the tunnel started in 1986, with a cost of almost 10 billion pounds. It was opened in 1994 but was not financially successful until 2007, because of the high interest rates (利率) the company had to pay the banks, as well as low earnings from passengers and goods.
The Eurotunnel is a very convenient way of traveling between the two countries as the journey is quick (less than one hour), cheap, and comfortable. You can go with your car, motorbike or bike. The tunnel operates every day, round the clock. At the busiest times there are up to three shuttle departures (班次) per hour. There are facilities(设施)for disabled passengers and for babies at the two terminals (终点站).
The Eurotunnel, also commonly known as the Channel Tunnel, Eurochannel and Eurochunnel is environmentally friendly. It perfects its sources of energy through its use of renewable energy with the result that, by 2008, it had reduced its greenhouse gas emissions(排量) by 45%. In addition, 50% of the waste produced is recycled.
The future of the Eurotunnel seems promising, although some people who have the fear of enclosed(与外界隔绝的)spaces will never use this type of transportation. There have been some problems with snow storms like the one in the winter of the 2009 which have made the services stop for a period of time, leaving passengers in the tunnel for more than 15 hours without light, heating, food or drink, inside an unmoving train under the sea. Some of the passengers reacted very badly and decided not to use this means of transport again.
1.Why was the Eurotunnel not financially successful at first? ______.
A. It was free for passing trains
B. Many people disliked it
C. Its operating cost was very high
D. It was heavily in debt
2.What is Paragraph 3 mainly about? ______.
A. The wonderful design of the Eurotunnel
B. A traveling guide to the Eurotunnel
C. The advantages of the Eurotunnel
D. An introduction of the Eurotunnel’s equipment
3.We can learn from the text that the Eurotunnel ______.
A. used environmentally friendly energy
B. was completely built under the seabed
C. was designed for passenger trains only
D. operated successfully without any accident
4.What is the author’s attitude towards the Eurotunnel? ______.
A. Cautious B. Optimistic
C. Negative D. Doubtful
高二英语阅读理解中等难度题查看答案及解析
It’s true that the old road is less direct and a bit longer. We won’t take the new one, ______, because we don’t feel as safe on it.
A. somewhat B. though C. therefore D. otherwise
高二英语单项填空中等难度题查看答案及解析