The major construction work on the world’s longest cross-sea bridge, which connects Zhuhai in Guangdong Province with Hong Kong and Macao, 1. (complete) last week.

Near the airports of Hong Kong and Macao, the project is one of the world’s 2. (busy) shipping routes(船运路线)3. more than 4,000 ships pass by every day. Much to people’s relief, Chinese white dolphins, an endangered species, enjoy top level national 4. (protect) here. 5. big ceremony was held in Zhuhai to celebrate the completion of the 55km cross-sea route and to mark the start of road surfacing. “This means the construction has entered 6. (it) final stage.” Said Zhu Yongling, head of the work.

More than 400,000 tons of steel have been used for the 6.7km undersea tunnel and 22.9km bridge, enough 7. (build) 60 Eiffel Towers. Two floating cranes(吊车) , 8. a load of 3,200 tons and 2,300 tons respectively, worked together to lift and roll the tower, 9. (set) a world record.

“If it were not for the progress of ‘Made in China’, we couldn’t 10. (possible) have made it in such a short time.” he added.

高二英语语法填空困难题

少年,再来一题如何?
试题答案
试题解析
相关试题